Playbook · For owners, production managers and schedulers
No job is scheduled until it is production-ready
A rep sells a roof, and production gets a signed PDF, a few photos, a text and a note. Because the crews are busy, the job goes on the calendar anyway. Then the crew arrives to the wrong shingles, no dumpster and no permit. One gate between sold and scheduled stops that. Six steps you can start on Monday.
Why the gate works
Gated handoffs like this one usually mean 50–90% fewer operational errors, and where pricing and procurement work supports it, 5–15 pt of gross margin.
Ranges from our KPI library: what this kind of work usually moves, not a promise for your company. Read the roofer's story
Write down what ready means
Use twelve checks: contract signed, deposit collected, financing complete, scope confirmed, measurements confirmed, selections confirmed, special orders identified, permit requirements confirmed, crew type, equipment, access instructions and the homeowner's scheduling limits.
Put them on one page. If your trade needs a thirteenth, add it. Do not drop one because it is awkward to check.
Give every check an owner
Sales owns what the sale produced: contract, deposit, financing, scope, measurements and selections. Production owns what the build needs: special orders, permit, crew type, equipment and access. The homeowner's scheduling limits are collected by sales and confirmed by production.
One name per check. If a check has two owners, it has none.
Keep one job record
Everything the sale produced goes into one place: the job record in the system you already use. Not a text, not a note in the truck, not an email thread.
A check is done when the proof is in the record: the signed contract, the deposit receipt, the colour code, the permit number.
Close the gate
From Monday, the scheduler books only jobs with all twelve checks done. No exceptions for busy weeks, because busy weeks are when half-ready jobs do the most damage.
A job that fails goes back to the owner of the missing check, with a note of what is missing. It does not go on the calendar with a promise to sort it out later.
Look at the not-ready list every morning
Keep one list of sold jobs that are not ready yet, with the missing check and its owner beside each one. Go through it for ten minutes every morning.
Long-lead items come up here first, so they are ordered weeks ahead instead of the day before the crew needs them.
Check what slipped on Friday
Count the crew days this week that went wrong because something was missing, and which check it was. If the same check keeps failing, fix it where it starts, usually in the sale.
Count the jobs waiting at the gate, too. A long wait means one owner needs help, not that the gate should open.
The twelve checks, with an owner beside each one. Copy the checklist.
Where the gate fits from first call to final invoice. Read the roofer's story.
A printable version is on its way.
Keep reading
- BreakdownOne way in, one gate out
- ToolIs this job burning labour?
- AnswerWhy do sold jobs stall before the crew shows up?
Part of our Operations & Automation work for Contractors & Construction, built as Field Ticket & Dispatch.
Want the gate checking itself?
Book a call. We will look at how your sold jobs reach the crew and set up the gate with you.
Book a callScore your business
Systems built to SOC 2, ISO 27001 and PIPEDA/PHIPA controls.